← Back to Insights
Series · Part 3 of 10

The PSecAC, the plan your whole certification stands on

Regulatory guidance19 November 20266 min readDan Locke
A Layperson's Guide to DO-326A/ED-202A. Part 3 of 10. The PSecAC, the plan your whole certification stands on.
Jargon Buster
Dotted terms carry explainers, hover or tap to read them.

Where this sits in the series

Part two details the 14 documents that certification runs on. This post dives into the first document - the PSecAC. Short for Plan for Security Aspects of Certification, this is the document that the whole programme revolves around. It's the plan you submit to the regulator which outlines key information around your entire compliance plan.

One naming note before we start. The standard's most recent revision is DO-326B, and everything in this series applies to it. We use the DO-326A name throughout because it's still the name most of the industry reaches for.

Agreements with the regulator, via the PSecAC

The most common way certification goes wrong is that a programme spends years building something, then finds out near the end that the authority was expecting something different. The PSecAC is there to stop that happening. It's a written agreement between you and your authority, made at the start of the programme, setting out what you'll show them, how you'll show it, and when.

You write it, the authority agrees it, and from then on it feeds everything else you do. It's also a living agreement rather than a one-off submission. If the authority raises an issue later in the programme, the issue gets resolved against the plan and the plan goes back in for approval. Because the rules were settled at the beginning, nothing about your certification is left to be argued about at the end, and this is why we'd call the PSecAC the foundation of the whole programme.

What goes in it

The standard is specific about what a complete plan contains. There are eight key areas.

  1. The regulatory requirements you're addressing (e.g. RA 5890, Def Stan 00-970).
  2. An overview of the aircraft architecture, focused on the parts that matter for security.
  3. The parts of your certification basis that apply to security.
  4. The means and methods you'll use to show compliance (e.g. DO-326A or ED-202A).
  5. An overview of your early security risk assessment.
  6. The data you'll produce, with named responsibility for delivering and approving each piece.
  7. How this plan relates to the other certification plans on the programme.
  8. The schedule of interactions with the authority.

Why other documents have to come first

This is the part that tends to surprise people on our course. The PSecAC is the first document in the set, and yet you can't actually write it first. If you look back at the list above, you can't give an overview of the security side of the architecture without a draft architecture in hand, you can't summarise your early risk assessment without having started one, and you can't choose your means of compliance without knowing what's in scope.

Because of this, some organisations choose to submit a stripped down version of the PSecAC first. It covers the details already known, such as the regulatory requirements being addressed, the compliance objectives, and the planned touch points with the regulator. Once that's agreed, the organisation can then build it out into a full PSecAC.

Worth being clear that this is a different thing to the PSecAC Summary, which you may also hear mentioned. The Summary is a separate document in the set altogether. It comes at the very end of the programme and shows the regulator how everything promised in the plan was actually delivered. So the plan opens the certification process, the Summary closes it, and a stripped down early plan is simply an early version of the opener.

So the plan stands on three building blocks, and all three should already exist in draft form by the time the plan goes to the authority. There's a scope definition, which draws the fence around what you're protecting. There's a draft of the security architecture, which records what's known so far, marks what's still to be decided, and states the assumptions being made. And there's an early risk assessment, which gives a first picture of what could go wrong. None of these need to be finished, drafts are expected, but they do need to be honest about what's known, what isn't, and which assumptions the certification will rest on. It's also worth saying that on some occasions the PSecAC is the first contact an organisation has with its regulator, and at that stage the scope, the risk assessment and the architecture may not exist at all. In that situation the plan can mention them lightly, saying what each will cover and when it will arrive, although a fully formed PSecAC should include all three.

Each of those building blocks gets a post of its own as this series goes on, starting with the scope in the next part.

Get the next session in your inbox

One email per post, for the length of the series. Nothing else.

Subscribe

What this means for your programme

Three things follow.

  1. Get in front of your authority early. The plan is the mechanism for doing it, and every month it isn't agreed is a month of work that might be pointed the wrong way.
  2. Treat the plan as a living document. Issues raised later get resolved against it and it goes back for approval, so keep it current rather than letting reality drift away from what it says.
  3. Start the building blocks before the plan. The scope, the draft architecture and the early risk work all come first, even though that sounds like a strange order for the set's opening document.

To sum up, producing a PSecAC relies on three other artefacts, the scope definition, the preliminary risk assessment, and the architecture and measures. A full PSecAC should include drafts of all three, and we cover each of them properly later in the series. Get the PSecAC right and everything that follows it has somewhere to stand.

In this series

  1. Why DO-326A/ED-202A exists, and whether it applies to you
  2. The 14 documents that prove an aircraft is compliant
  3. The PSecAC, the plan your whole certification stands on (this post)

Where this sits in the series

Part two set out the artefact set of the AWSPAirworthiness Security Process. The seven-step process DO-326A/ED-202A defines, running from the certification plan through risk assessment and security development to the final communication of evidence.. This post goes inside step one. The PSecACPlan for Security Aspects of Certification. The opening certification artefact, defined by the applicant, agreed with the Authority, and an input to every further activity in the framework. opens the framework, and the standard now sits at revision DO-326B/ED-202B. This series keeps the better-known DO-326A name, and everything in it applies to the current revision.

The A.1.1 activity

The activity, as Appendix A describes it, is to identify means for demonstrating compliance with airworthiness regulations relative to security concerns. Table A-1 recommends the PSecAC for certification, with process independence as negotiated with the Authority. The plan is defined by the applicant, agreed by the Authority, and becomes an input to every further activity.

The activity has defined inputs. Any regulatory requirements for information security, the aircraft certification planning data, and the current outputs of the ASSDAircraft Security Scope Definition. Establishes the operational environment for information security, the security perimeter, the assets, the interfaces and the existing measures., the draft ASAMAircraft Security Architecture and Measures. The aircraft-level security architecture and the measures that implement it. Expected to be draft and preliminary at PSecAC time. and the PASRAPreliminary Aircraft Security Risk Assessment. The early aircraft-level assessment of threat conditions and their severities, coordinated with the safety process.. Within it the applicant determines the certification basis, including any change impact analysis results where the programme is a modification, determines the acceptable means of compliance and the certification data package, defines and schedules the major milestones, coordinates with the other certification materials, resolves issues raised by the Authority, and submits the plan for approval. The outputs are the approved plan and its links into the wider certification planning data.

The compliance objectives

The plan is judged correct and complete when it addresses the regulatory requirements, the security-pertinent architecture, the applicable certification basis and the means of compliance. Four further content areas complete the set. An overview of the PASRA, the substantiating data with responsibilities for delivery and approval, the relationships to the other certification plans, and the schedule of Authority interactions. Eight areas in all, and delegates on our course build a skeleton PSecAC against exactly that outline.

Two liaison objectives sit behind the plan in DO-356A/ED-203A. The PSecAC is provided and agreed, and substantiation evidence is provided. In a mature safety process at the highest assurance, these objectives are met when security is included in the existing plans and standards rather than through a parallel paper trail.

The building blocks the plan relies on

The PSecAC leans on three artefacts already in draft. The ASSD establishes the operational environment for information security, meaning the security perimeter, the aircraft assets, the information interfaces and the existing security measures. The PASRA identifies threat conditions and evaluates the severity of each effect, coordinated with the safety assessment process after the FHAFunctional Hazard Assessment. The safety process activity that identifies failure conditions and their severities. The preliminary security assessment starts from its outputs.. The ASAM at PSecAC time is expected to be draft and preliminary. Record the architectural elements and measures known so far, mark what is TBD, and state the assumptions certification will rest on.

Each of these gets fuller treatment as the series goes on, the scoping method in the next part and the assessments in the parts after. At plan stage, the main thing is to be honest about how mature each of them is. The Authority would far rather see a draft that is clear about what's known and what's assumed than a polished document that hides its gaps. Timing also varies by programme. Where the PSecAC is the initial touch point with the Authority, the ASSD, PASRA and draft ASAM may not exist yet, and the plan can reference them lightly, stating what each will cover and when it will arrive. A fully formed PSecAC should include all three. Some applicants take this further and agree a stripped down PSecAC with the Authority first, covering what's already known, the regulatory requirements, the compliance objectives and the planned Authority interactions, then develop it into the full plan once agreed. That differs from the PSecAC Summary, which is the closing artefact of the set, produced at the end of the programme to show how the agreed plan was carried out.

Get the next session in your inbox

One email per post, for the length of the series. Nothing else.

Subscribe

Programme implications

Three follow directly.

  1. Agree the plan early. It sets the agreed boundary of your certification, and for a modification programme the change impact analysis results belong in the certification basis determination rather than in a late argument with the Authority.
  2. Keep it living. Issues raised by the Authority are resolved against the plan and the plan is resubmitted for approval, so version it, staff it and expect to revisit it.
  3. Sequence the building blocks first. The scope, the preliminary assessment and the draft architecture are all inputs to the A.1.1 activity, so give them the time they need before the plan gets drafted.

In this series

  1. Why DO-326A/ED-202A exists, and whether it applies to you
  2. The 14 documents that prove an aircraft is compliant
  3. The PSecAC, the plan your whole certification stands on (this post)

Next part

Get each part by email.

One email when something new goes up in the topics you pick. Nothing else, unsubscribe any time.

Unsubscribe link in every email. Privacy policy.

Cyber Security Certification

Prefer it taught?

The same framework as a 2-day course, BCS accredited. Next cohort 26 to 27 January 2027, South Wales.

Course details